Project Details

This page displays current information for project DEA: 040A53T4.

Project Information

Project IdentifiersProject ID: 1001375
DEA: 040A53T4
EFIS: 0421000155
COOP: 040A53TCM
DIST-CO-RTE-PM04-SOL-80-L1.8/L3.2
Award Date06/20/2025
Closeout DateNot set
Work DescriptionConstruct I-80 WB Truck Scales
Location DescriptionCONSTRUCTION ON STATE HIGHWAY IN SOLANO COUNTY IN AND NEAR FAIRFIELD ON ROUTE 12 FROM THE 80/12 EAST JUNCTION TO 0.9 MILE EAST OF CHADBOURNE ROAD UNDERCROSSING AND ON ROUTE 80 FROM 0.5 MILE WEST OF DAN WILSON CREEK BRIDGE TO WEST TEXAS STREET UNDERCROSSI
QA Service Level1 (Verified on 07/10/2025)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
nana.budu@dot.ca.govNana BuduStructural RepresentativeCaltrans SR DB
dylan.larose@dot.ca.govDylan LaroseMETS REPCaltrans METS REP DB

Samples

Samples submitted for this project.

Displaying 1-10 of 25 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
   
2025-10-24-4810/24/202510/27/2025Quality ControlConcreteView
2025-10-21-5410/21/202510/21/2025Quality AssuranceSoilView
2025-10-16-7210/16/202510/16/2025Quality AssuranceSoilView
2025-10-16-7110/16/202510/16/2025Quality AssuranceSoilView
2025-09-03-10509/03/202509/03/2025Quality AssuranceSoilView
2025-09-02-11109/02/202509/02/2025Quality AssuranceSoilView
2025-08-25-11708/25/202508/25/2025Quality AssuranceSoilView
2025-08-20-10408/20/202508/20/2025Quality AssuranceSoilView
2025-08-19-9208/19/202508/19/2025Quality AssuranceSoilView
2025-11-23-811/23/2025Quality AssuranceSMTL TM3 - Fastener AssemblyView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Precast Concrete Forms

Project DEADIME Sample IDSample Taken DateLink
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods