Project Details
This page displays current information for project DEA: 040A53T4.
Project Information
| Project Identifiers | Project ID: 1001375 DEA: 040A53T4 EFIS: 0421000155 COOP: 040A53TCM |
|---|---|
| DIST-CO-RTE-PM | 04-SOL-80-L1.8/L3.2 |
| Award Date | 06/20/2025 |
| Closeout Date | Not set |
| Work Description | Construct I-80 WB Truck Scales |
| Location Description | CONSTRUCTION ON STATE HIGHWAY IN SOLANO COUNTY IN AND NEAR FAIRFIELD ON ROUTE 12 FROM THE 80/12 EAST JUNCTION TO 0.9 MILE EAST OF CHADBOURNE ROAD UNDERCROSSING AND ON ROUTE 80 FROM 0.5 MILE WEST OF DAN WILSON CREEK BRIDGE TO WEST TEXAS STREET UNDERCROSSI |
| QA Service Level | 1 (Verified on 07/10/2025) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| nana.budu@dot.ca.gov | Nana Budu | Structural Representative | Caltrans SR DB |
| dylan.larose@dot.ca.gov | Dylan Larose | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 25 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-10-24-48 | 10/24/2025 | 10/27/2025 | Quality Control | Concrete | View |
| 2025-10-21-54 | 10/21/2025 | 10/21/2025 | Quality Assurance | Soil | View |
| 2025-10-16-72 | 10/16/2025 | 10/16/2025 | Quality Assurance | Soil | View |
| 2025-10-16-71 | 10/16/2025 | 10/16/2025 | Quality Assurance | Soil | View |
| 2025-09-03-105 | 09/03/2025 | 09/03/2025 | Quality Assurance | Soil | View |
| 2025-09-02-111 | 09/02/2025 | 09/02/2025 | Quality Assurance | Soil | View |
| 2025-08-25-117 | 08/25/2025 | 08/25/2025 | Quality Assurance | Soil | View |
| 2025-08-20-104 | 08/20/2025 | 08/20/2025 | Quality Assurance | Soil | View |
| 2025-08-19-92 | 08/19/2025 | 08/19/2025 | Quality Assurance | Soil | View |
| 2025-11-23-8 | 11/23/2025 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
