Project Details
This page displays current information for project DEA: 023H7704.
Project Information
| Project Identifiers | Project ID: 1001306 DEA: 023H7704 EFIS: 0218000039 |
|---|---|
| DIST-CO-RTE-PM | 02-TEH-99-0.0/12.5 |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | VINA REHAB: PLACE HMA, INSTALL CULVERTS, AND INSTALL GUARDRAIL. |
| Location Description | TEHAMA COUNTY IN AND NEAR LOS MOLINOS FROM BUTTE COUNTY LINE TO LOS MOLINOS CREEK BRIDGE |
| QA Service Level | 1 (Verified on 06/12/2025) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| edward.worden@dot.ca.gov | Edward Worden | Resident Engineer | Caltrans RE DB |
| peter.gan@dot.ca.gov | Peter Gan | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 13 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2026-05-29-49 | 05/29/2026 | 05/29/2026 | Acceptance | Soil | View |
| 2026-05-10-16 | 05/10/2026 | 05/11/2026 | Production Start-Up | Hot Mix Asphalt | View |
| 2026-05-10-15 | 05/10/2026 | 05/11/2026 | Production Start-Up | Reclaimed Asphalt Pavement | View |
| 2026-05-10-14 | 05/10/2026 | 05/11/2026 | Production Start-Up | Aggregate | View |
| 2026-05-14-48 | 05/14/2026 | 05/15/2026 | Acceptance | Aggregate | View |
| 2026-04-24-77 | 04/24/2026 | 04/30/2026 | Verification | Asphalt Binder | View |
| 2026-04-14-45 | 04/14/2026 | 04/30/2026 | Verification | Crumb Rubber Modifier | View |
| 2026-04-14-44 | 04/14/2026 | 04/30/2026 | Verification | Crumb Rubber Modifier | View |
| 2026-04-01-107 | 04/01/2026 | 04/30/2026 | Verification | Asphalt Rubber Binder | View |
| 2026-05-10-11 | 05/10/2026 | 05/20/2026 | Quality Assurance | Asphalt Binder | View |
Job Mix Formula (JMF)
JMFs associated with this project.
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods