Project Details
This page displays current information for project DEA: 031N5504.
Project Information
| Project Identifiers | Project ID: 1001249 DEA: 031N5504 EFIS: 0325000797 |
|---|---|
| DIST-CO-RTE-PM | 03-BUT-70-35/36 |
| Award Date | 11/20/2024 |
| Closeout Date | Not set |
| Work Description | Major Damage Restoration |
| Location Description | BUT 70 Viaduct |
| QA Service Level | 1 (Verified on 05/06/2025) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| Adam.Scardaci@dot.ca.gov | Adam Scardaci | Resident Engineer | Caltrans RE DB |
| adam.scardaci@dot.ca.gov | Adam Scardaci | Structural Representative | Caltrans SR DB |
| farzan.kazemi@dot.ca.gov | Farzan Kazemi | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 39 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-11-24-16 | 11/24/2025 | 11/24/2025 | Quality Assurance | Hot Mix Asphalt | View |
| 2025-11-25-11 | 11/25/2025 | 11/25/2025 | Quality Assurance | Hot Mix Asphalt | View |
| 2025-10-09-23 | 10/09/2025 | 08/01/2025 | Quality Assurance | Concrete | View |
| 2025-10-09-22 | 10/09/2025 | 08/01/2025 | Quality Assurance | Concrete | View |
| 2025-08-21-7 | 08/21/2025 | 08/21/2025 | Acceptance | SMTL TM3 - Fastener Assembly | View |
| 2025-08-21-6 | 08/21/2025 | 08/21/2025 | Acceptance | SMTL TM3 - Fastener Assembly | View |
| 2025-08-11-42 | 08/11/2025 | 08/19/2025 | Quality Assurance | SMTL TM1 - Elastomeric Bearing Pad | View |
| 2025-07-31-33 | 07/31/2025 | 08/01/2025 | Quality Assurance | Concrete | View |
| 2025-07-15-39 | 07/15/2025 | 07/16/2025 | Quality Assurance | Concrete | View |
| 2025-07-09-38 | 07/09/2025 | 07/10/2025 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
