Project Details

This page displays current information for project DEA: 070Y1604.

Project Information

Project IdentifiersProject ID: 1001225
DEA: 070Y1604
EFIS: 0724000137
DIST-CO-RTE-PM07-LA-210-R9.9/R22.5
Award Date06/26/2025
Closeout DateNot set
Work DescriptionSLAB REPLACEMENT, SLURRY SEAL, AND DIGOUTS.
Location DescriptionLOS ANGELES COUNTY, IN LOS ANGELES, LA CANADA FLINTRIDGE, GLENDALE, AND PASADENA FROM BIG TUJUNGA WASH BRIDGE TO ARROYO BOULEVARD OVERCROSSING
QA Service Level1 (Verified on 07/02/2025)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
danglong.m.tran@dot.ca.govBill TranResident EngineerCaltrans RE DB
maziar.kazemian@dot.ca.govMaziar KazemianMETS REPCaltrans METS REP DB

Samples

Samples submitted for this project.

Displaying 1-9 of 9 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
   
2025-10-06-3710/06/202510/09/2025VerificationAsphalt Rubber BinderView
2025-10-06-3610/06/202510/09/2025VerificationAsphalt BinderView
2025-10-06-3510/06/202510/09/2025Production Start-UpHot Mix AsphaltView
2025-10-06-3310/06/202510/09/2025VerificationCrumb Rubber ModifierView
2025-10-06-3110/06/202510/09/2025VerificationCrumb Rubber ModifierView
2025-10-06-3010/06/202510/09/2025VerificationAggregateView
2025-09-24-4609/24/202509/29/2025VerificationAsphalt BinderView
2025-09-24-4409/24/202509/29/2025Production Start-UpHot Mix AsphaltView
2025-09-24-3709/24/202509/29/2025VerificationAggregateView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Precast Concrete Forms

Project DEADIME Sample IDSample Taken DateLink
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods