Project Details
This page displays current information for project DEA: 021J8904.
Project Information
| Project Identifiers | Project ID: 1001219 DEA: 021J8904 EFIS: 0221000006 |
|---|---|
| DIST-CO-RTE-PM | 02-SHA-5-R30.5/R31.0 |
| Award Date | 07/02/2025 |
| Closeout Date | Not set |
| Work Description | REPLACE PAVEMENT AND PLACE POLYESTER CONCRETE OVERLAY. |
| Location Description | SHASTA COUNTY NEAR O\'BRIEN FROM 0.1 MILE SOUTH OF TUNNEL GULCH VIADUCT TO THE O\'BRIEN REST AREA |
| QA Service Level | 1 (Verified on 05/05/2025) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| kyle.higgins@dot.ca.gov | Kyle Higgins | Resident Engineer | Caltrans RE DB |
| chris.brace@dot.ca.gov | Chris Brace | Structural Representative | Caltrans SR DB |
| peter.gan@dot.ca.gov | Peter Gan | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 30 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-09-05-120 | 09/05/2025 | 09/05/2025 | Quality Control | Aggregate | View |
| 2025-10-15-73 | 10/15/2025 | 10/17/2025 | Quality Control | Aggregate | View |
| 2025-10-27-66 | 10/27/2025 | 10/28/2025 | Quality Control | Concrete | View |
| 2025-10-27-65 | 10/27/2025 | 10/28/2025 | Quality Control | Aggregate | View |
| 2025-10-23-90 | 10/23/2025 | 10/23/2025 | Quality Control | Concrete | View |
| 2025-10-23-89 | 10/23/2025 | 10/23/2025 | Quality Control | Aggregate | View |
| 2025-10-19-22 | 10/19/2025 | 10/19/2025 | Quality Control | Concrete | View |
| 2025-10-19-21 | 10/19/2025 | 10/20/2025 | Quality Control | Aggregate | View |
| 2025-10-22-96 | 10/22/2025 | 10/23/2025 | Quality Control | Concrete | View |
| 2025-10-22-95 | 10/22/2025 | 10/22/2025 | Quality Control | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
