Project Details

This page displays current information for project DEA: 07319604.

Project Information

Project IdentifiersProject ID: 1001197
DEA: 07319604
EFIS: 0716000025
DIST-CO-RTE-PM07-VEN-1,101-21.3/21.9,R34.9/R36.1
Award Date09/16/2025
Closeout DateNot set
Work DescriptionREMOVE AND CONSTRUCT BRIDGE.
Location DescriptionVENTURA COUNTY ON ROUTE 1 FROM 1.8 MILES NORTH OF ROUTE 1/33 SEPARATION TO 2.0 MILES SOUTH OF A LEASE CANYON ROAD AND ON ROUTE 101 FROM 0.4 MILE NORTH OF DULAH ROAD UNDERCROSSING TO SAN MIGUELITO ROAD UNDERCROSSING
QA Service Level1 (Verified on 07/01/2025)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
ranjit.singh@dot.ca.govRanjit SinghResident EngineerCaltrans RE DB
azizollah.maghsoudloo@bureauveritas.comAziz MaghsoudlooStructural RepresentativeCaltrans SR DB
jennifer.olarte@dot.ca.govJennifer OlarteMETS REPCaltrans METS REP DB

Samples

Samples submitted for this project.

Displaying 1-10 of 20 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
   
2026-06-24-1906/24/202606/24/2026Quality ControlPrecast ConcreteView
2026-06-24-1806/24/202606/25/2026Quality AssurancePrecast ConcreteView
2026-06-25-406/25/202606/25/2026Quality AssuranceSMTL TM3 - Fastener AssemblyView
2026-06-19-2106/19/202606/19/2026Quality ControlPrecast ConcreteView
2026-06-02-4506/02/202606/02/2026Quality ControlPrecast ConcreteView
2026-05-28-2505/28/202605/28/2026Quality ControlAggregateView
2026-05-28-2405/28/202605/28/2026Quality ControlAggregateView
2026-05-28-2305/28/202605/28/2026Quality ControlAggregateView
2026-05-29-2605/29/202606/02/2026Quality AssuranceSMTL TM6 - Ductile Iron Cast SamplesView
2026-05-27-1505/27/202605/28/2026Quality AssuranceSMTL TM3 - Fastener AssemblyView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Precast Concrete Forms

Project DEADIME Sample IDSample Taken DateLink
073196042026-06-24-1906/24/2026View
073196042026-06-19-2106/19/2026View
073196042026-06-02-4506/02/2026View

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods