Project Details
This page displays current information for project DEA: 010N6304.
Project Information
| Project Identifiers | Project ID: 1001189 DEA: 010N6304 EFIS: 0124000081 |
|---|---|
| DIST-CO-RTE-PM | 01-MEN-162-2.6/4.4 |
| Award Date | 06/18/2025 |
| Closeout Date | Not set |
| Work Description | CULVERT INSTALLATION AND REMOVAL. |
| Location Description | MENDOCINO COUNTY AT VARIOUS LOCATIONS FROM 0.4 MILES EAST OF ROAD 8152 TO 2.8 MILES WEST OF BLOODY RUN CREEK BRIDGE 10-235 |
| QA Service Level | 1 (Verified on 05/05/2025) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| lkostrzewa@ghirardelliassoc.com | Lucy Kostrzewa | Resident Engineer | Caltrans RE DB |
| peter.gan@dot.ca.gov | Peter Gan | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
