Project Details
This page displays current information for project DEA: 112N2064.
Project Information
| Project Identifiers | Project ID: 1001127 DEA: 112N2064 EFIS: 1123000285 |
|---|---|
| DIST-CO-RTE-PM | 11-SD-94-1.6/R13.3 |
| Award Date | 06/03/2025 |
| Closeout Date | Not set |
| Work Description | POLYESTER CONCRETE, METHACRYLATE, JOINT SEALS AND APPROACH SLABS. |
| Location Description | SAN DIEGO COUNTY AT VARIOUS LOCATIONS FROM 22ND STREET OVERCROSSING TO AVOCADO BOULEVARD OVERCROSSING |
| QA Service Level | 1 (Verified on 06/02/2025) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| Tyler.jones@dot.ca.gov | Tyler Jones | Structural Representative | Caltrans SR DB |
| julien.atallah@dot.ca.gov | Julien Atallah | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-6 of 6 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-11-04-53 | 11/04/2025 | 11/05/2025 | Quality Assurance | Hot Mix Asphalt | View |
| 2025-11-04-52 | 11/04/2025 | 11/05/2025 | Quality Assurance | Aggregate | View |
| 2025-11-03-55 | 11/03/2025 | 11/04/2025 | Production Start-Up | Hot Mix Asphalt | View |
| 2025-11-03-54 | 11/03/2025 | 11/04/2025 | Production Start-Up | Aggregate | View |
| 2025-09-04-50 | 09/04/2025 | 09/08/2025 | Quality Control | Polyester | View |
| 2025-07-31-36 | 07/31/2025 | 08/18/2025 | Quality Control | Polyester | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
