Project Details
This page displays current information for project DEA: 06484674.
Project Information
| Project Identifiers | Project ID: 1001110 DEA: 06484674 EFIS: 0623000083 COOP: 061794 |
|---|---|
| DIST-CO-RTE-PM | 06-KER-- |
| Award Date | 10/03/2024 |
| Closeout Date | Not set |
| Work Description | Not set |
| Location Description | Not set |
| QA Service Level | 2 (Verified on 03/28/2025) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| benjamin.holton@accenture.com | Benjamin Holton | Oversight Resident Engineer | Caltrans REO DB |
| anh.case@enterrisassociates.com | Anh Case | Oversight Structural Representative | Caltrans SRO DB |
| jennifer.olarte@dot.ca.gov | Jennifer Olarte | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 79 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2026-02-11-38 | 02/11/2026 | 02/12/2026 | Quality Control | Aggregate | View |
| 2025-10-23-92 | 10/23/2025 | 10/24/2025 | Quality Control | Concrete | View |
| 2025-10-24-75 | 10/24/2025 | 10/24/2025 | Quality Control | Concrete | View |
| 2025-10-23-91 | 10/23/2025 | 10/24/2025 | Quality Control | Concrete | View |
| 2026-04-09-6 | 04/09/2026 | 04/09/2026 | Quality Assurance | Roadway/Bridge Surface | View |
| 2025-10-23-88 | 10/23/2025 | 10/24/2025 | Quality Control | Concrete | View |
| 2025-10-23-87 | 10/23/2025 | 10/24/2025 | Quality Control | Concrete | View |
| 2025-10-23-86 | 10/23/2025 | 10/24/2025 | Quality Control | Concrete | View |
| 2025-10-30-92 | 10/30/2025 | 10/31/2025 | Quality Control | Concrete | View |
| 2025-10-23-80 | 10/23/2025 | 10/24/2025 | Quality Control | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
