Project Details
This page displays current information for project DEA: 040W0304.
Project Information
| Project Identifiers | Project ID: 1001075 DEA: 040W0304 EFIS: 0420000164 |
|---|---|
| DIST-CO-RTE-PM | 04-ALA-580-0.02/6.3 |
| Award Date | 10/16/2025 |
| Closeout Date | Not set |
| Work Description | Replace existing tolling structure with open road tolling (ORT) system at the Richmond-San Rafael. |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 03/13/2025) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| William.Sommer@dot.ca.gov | William Sommer | Resident Engineer | Caltrans RE DB |
| Eric.Racadag@dot.ca.gov | Eric Racadag | Structural Representative | Caltrans SR DB |
| dylan.larose@dot.ca.gov | Dylan Larose | METS REP | Caltrans METS REP DB |
| jacob.duncan@dot.ca.gov | Jacob Duncan | District Materials Engineer - Design West | Caltrans District Materials Engineer |
| mohammad.zabolzadeh@dot.ca.gov | Mohammad Zabolzadeh | District Materials Engineer - Design East | Caltrans District Materials Engineer |
Samples
Samples submitted for this project.
Displaying 1-10 of 32 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2026-10-06-2 | 10/06/2026 | Quality Assurance | SMTL TM3 - Fastener Assembly | View | |
| 2026-09-09-49 | 09/09/2026 | 09/30/2026 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2026-09-09-48 | 09/09/2026 | 09/30/2026 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2026-09-09-47 | 09/09/2026 | 09/30/2026 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2026-09-09-46 | 09/09/2026 | 09/30/2026 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2026-09-09-45 | 09/09/2026 | 09/30/2026 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2026-09-09-44 | 09/09/2026 | 09/30/2026 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2026-09-09-7 | 09/09/2026 | 09/30/2026 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2026-09-02-37 | 09/02/2026 | 09/04/2026 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2026-09-03-7 | 09/03/2026 | 07/31/2026 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
