Project Details
This page displays current information for project DEA: 010J2104.
Project Information
| Project Identifiers | Project ID: 1000997 DEA: 010J2104 EFIS: 0118000190 |
|---|---|
| DIST-CO-RTE-PM | 01-DN-101-R2.6/23.9 |
| Award Date | 06/06/2025 |
| Closeout Date | Not set |
| Work Description | RHMA, HMA, AND COLD PLANE ASPHALT CONCRETE PAVEMENT. |
| Location Description | DEL NORTE COUNTY IN AND NEAR KLAMATH FROM 1.2 MILES SOUTH OF KLAMATH RIVER OVERFLOW TO 1.1 MILE NORTH OF HAMILTON ROAD |
| QA Service Level | 1 (Verified on 03/21/2025) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| Aaron.Valley@dot.ca.gov | Aaron Valley | Resident Engineer | Caltrans RE DB |
| joshua.erler@dot.ca.gov | Joshua Erler | Structural Representative | Caltrans SR DB |
| peter.gan@dot.ca.gov | Peter Gan | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 12 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2026-04-22-25 | 04/22/2026 | 04/22/2026 | Quality Assurance | Hot Mix Asphalt | View |
| 2026-04-22-24 | 04/22/2026 | 04/22/2026 | Quality Assurance | Hot Mix Asphalt | View |
| 2026-04-22-14 | 04/22/2026 | 04/22/2026 | Quality Assurance | Hot Mix Asphalt | View |
| 2026-04-22-13 | 04/22/2026 | 04/22/2026 | Quality Assurance | Aggregate | View |
| 2026-04-22-12 | 04/22/2026 | Acceptance | Asphalt Binder | View | |
| 2026-04-22-11 | 04/22/2026 | Acceptance | Reclaimed Asphalt Pavement | View | |
| 2026-04-22-10 | 04/22/2026 | 04/22/2026 | Acceptance | Aggregate | View |
| 2026-04-22-9 | 04/22/2026 | 04/22/2026 | Acceptance | Hot Mix Asphalt | View |
| 2026-04-17-20 | 04/17/2026 | 04/20/2026 | Quality Assurance | Concrete | View |
| 2026-03-27-37 | 03/27/2026 | 04/03/2026 | Quality Assurance | Asphalt Rubber Binder | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
