Project Details
This page displays current information for project DEA: 101T5604.
Project Information
| Project Identifiers | Project ID: 1000973 DEA: 101T5604 EFIS: 1025000023 |
|---|---|
| DIST-CO-RTE-PM | 10-SJ-99- |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | Bridge Girder Repair |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 02/13/2025) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| chris.hanson@dot.ca.gov | Chris Hanson | Resident Engineer | Caltrans RE DB |
| daniel.laureno@dot.ca.gov | Daniel Laureno | Structural Representative | Caltrans SR DB |
| justin.palmaymesa@dot.ca.gov | Justin Palmaymesa | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-4 of 4 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-12-01-17 | 12/01/2025 | Quality Assurance | SMTL TM5 - Couplers | View | |
| 2025-04-24-16 | 04/24/2025 | 05/05/2025 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2025-04-24-15 | 04/24/2025 | 04/28/2025 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2025-04-14-6 | 04/14/2025 | 04/17/2025 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
