Project Details
This page displays current information for project DEA: 061G8304.
Project Information
| Project Identifiers | Project ID: 1000926 DEA: 061G8304 EFIS: 0624000171 |
|---|---|
| DIST-CO-RTE-PM | 06-FRE-99-19.9/21.4 |
| Award Date | 03/27/2025 |
| Closeout Date | 11/10/2025 |
| Work Description | REPLACE CONCRETE SLABS WITH HMA, COLD PLANE AND PLACE HMA (TYPE A). |
| Location Description | FRESNO COUNTY IN FRESNO FROM 0.1 MILE NORTH OF CALIFORNIA AVENUE OVERCROSSING TO 0.1 MILE SOUTH OF EL DORADO STREET OVERCROSSING |
| QA Service Level | 1 (Verified on 03/04/2025) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| No results found. | |||
Samples
Samples submitted for this project.
Displaying 1-10 of 20 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-07-20-2 | 07/20/2025 | 07/21/2025 | Quality Assurance | Aggregate | View |
| 2025-07-20-1 | 07/20/2025 | 07/21/2025 | Quality Assurance | Hot Mix Asphalt | View |
| 2025-07-17-9 | 07/17/2025 | 07/17/2025 | Quality Assurance | Hot Mix Asphalt | View |
| 2025-07-17-8 | 07/17/2025 | 07/17/2025 | Quality Assurance | Aggregate | View |
| 2025-07-16-29 | 07/16/2025 | 07/17/2025 | Quality Assurance | Hot Mix Asphalt | View |
| 2025-07-16-28 | 07/16/2025 | 07/17/2025 | Quality Assurance | Aggregate | View |
| 2025-07-15-36 | 07/15/2025 | 07/16/2025 | Quality Assurance | Hot Mix Asphalt | View |
| 2025-07-15-35 | 07/15/2025 | 07/16/2025 | Quality Assurance | Aggregate | View |
| 2025-07-14-20 | 07/14/2025 | 07/15/2025 | Quality Assurance | Hot Mix Asphalt | View |
| 2025-07-14-19 | 07/14/2025 | 07/14/2025 | Quality Assurance | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
