Project Details
This page displays current information for project DEA: 081M0404.
Project Information
| Project Identifiers | Project ID: 1000903 DEA: 081M0404 EFIS: 0821000091 |
|---|---|
| DIST-CO-RTE-PM | 08-SBD-40-R140.0/R142.2 |
| Award Date | 06/06/2025 |
| Closeout Date | Not set |
| Work Description | COLD PLANE AC & RHMA, VEGETATION CONTROL (MINOR CONC), MGS, AND HTCB. |
| Location Description | SAN BERNARDINO COUNTY IN NEEDLES FROM FOX WASH OVERFLOW TO L STREET UNDERCROSSING |
| QA Service Level | 1 (Verified on 01/13/2025) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| anthony.v.doan@dot.ca.gov | Anthony Doan | Resident Engineer | Caltrans RE DB |
| jegbefume.adodo@dot.ca.gov | Jegbefume Adodo | Structural Representative | Caltrans SR DB |
| jacob.bailey@dot.ca.gov | Jacob Bailey | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-8 of 8 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-12-02-18 | 12/02/2025 | 12/04/2025 | Quality Assurance | Concrete | View |
| 2025-12-02-16 | 12/02/2025 | 12/02/2025 | Acceptance | Aggregate | View |
| 2025-11-07-58 | 11/07/2025 | 11/14/2025 | Acceptance | Aggregate | View |
| 2025-11-06-28 | 11/06/2025 | 11/10/2025 | Quality Assurance | Concrete | View |
| 2025-11-04-33 | 11/04/2025 | 11/10/2025 | Quality Assurance | Concrete | View |
| 2025-09-05-48 | 09/05/2025 | 09/11/2025 | Verification | Asphalt Binder | View |
| 2025-09-05-42 | 09/05/2025 | 09/11/2025 | Verification | Hot Mix Asphalt | View |
| 2025-09-05-40 | 09/05/2025 | 09/11/2025 | Verification | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods