Project Details
This page displays current information for project DEA: 07346504.
Project Information
| Project Identifiers | Project ID: 1000857 DEA: 07346504 EFIS: 0718000075 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-91-6.0/R20.7 |
| Award Date | 07/14/2025 |
| Closeout Date | Not set |
| Work Description | REPLACE OVERHEAD SIGNS & SIGN STRUCTURES, CONSTRUCT MVPS & LANDSCAPING |
| Location Description | LOS ANGELES COUNTY ON ROUTE 91 AT VARIOUS LOCATIONS FROM VERMONT AVENUE IN LOS ANGELES TO THE ORANGE COUNTY LINE IN CERRITOS |
| QA Service Level | 1 (Verified on 01/13/2025) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| steven.taing@dot.ca.gov | Steven Taing | Resident Engineer | Caltrans RE DB |
| quan.ho@dot.ca.gov | Quan Ho | Structural Representative | Caltrans SR DB |
| jennifer.olarte@dot.ca.gov | Jennifer Olarte | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-8 of 8 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2026-02-09-51 | 02/09/2026 | 02/09/2026 | Quality Assurance | Soil | View |
| 2026-02-09-50 | 02/09/2026 | 02/09/2026 | Quality Assurance | Soil | View |
| 2026-02-13-33 | 02/13/2026 | 02/13/2026 | Quality Assurance | Soil | View |
| 2026-02-13-32 | 02/13/2026 | 02/13/2026 | Quality Assurance | Soil | View |
| 2026-02-02-37 | 02/02/2026 | 02/06/2026 | Verification | Crumb Rubber Modifier | View |
| 2026-02-02-36 | 02/02/2026 | 02/06/2026 | Verification | Crumb Rubber Modifier | View |
| 2026-02-02-10 | 02/02/2026 | 02/02/2026 | Acceptance | Soil | View |
| 2026-02-02-9 | 02/02/2026 | 02/02/2026 | Acceptance | Soil | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
