Project Details
This page displays current information for project DEA: 081J3204.
Project Information
| Project Identifiers | Project ID: 1000785 DEA: 081J3204 EFIS: 0818000017 COOP: NONE |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-74-17.8 |
| Award Date | 05/29/2025 |
| Closeout Date | Not set |
| Work Description | BUILDING WORK, WROUGHT IRON FENCE, HOT MIX ASPHALT, & AGGREGATE BASE. |
| Location Description | RIVERSIDE COUNTY NEAR LAKE ELSINORE AT LAKE ELSINORE MAINTENANCE STATION AT 18745 CONARD AVENUE |
| QA Service Level | 1 (Verified on 01/13/2025) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| jason.shbaita@dot.ca.gov | Jason Shbaita | Resident Engineer | Caltrans RE DB |
| jacob.bailey@dot.ca.gov | Jacob Bailey | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 16 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2026-02-27-10 | 02/27/2026 | 03/03/2026 | Quality Assurance | Concrete | View |
| 2025-09-29-84 | 09/29/2025 | 10/06/2025 | Verification | Asphalt Binder | View |
| 2025-12-19-31 | 12/19/2025 | 12/19/2025 | Acceptance | Soil | View |
| 2025-12-17-82 | 12/17/2025 | 12/17/2025 | Acceptance | Soil | View |
| 2025-12-15-50 | 12/15/2025 | 12/15/2025 | Acceptance | Soil | View |
| 2025-12-05-69 | 12/05/2025 | 12/05/2025 | Acceptance | Soil | View |
| 2025-12-05-68 | 12/05/2025 | 12/05/2025 | Acceptance | Soil | View |
| 2025-12-04-64 | 12/04/2025 | 12/04/2025 | Acceptance | Soil | View |
| 2025-12-04-63 | 12/04/2025 | 12/04/2025 | Acceptance | Soil | View |
| 2025-12-03-88 | 12/03/2025 | 12/03/2025 | Acceptance | Soil | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
