Project Information
| Project Identifiers | Project ID: 1000781 DEA: 040P9304 EFIS: 0418000027 |
|---|---|
| DIST-CO-RTE-PM | 04-CC-80-7.6,12.8 |
| Award Date | 03/19/2025 |
| Closeout Date | Not set |
| Work Description | BRIDGE RAILING, MVP, CURB & GUTTER, SIDEWALKS, & ELECTRICAL SYSTEMS. |
| Location Description | CONTRA COSTA COUNTY IN PINOLE AT APPIAN WAY OVERCROSSING AND NEAR HERCULES AT CUMMINGS SKYWAY OVERCROSSING. |
| QA Service Level | 1 (Verified on 12/27/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| zhuohang.deng@dot.ca.gov | Zhuohang Deng | Resident Engineer | Caltrans RE DB |
| rommoney.wu@dot.ca.gov | Rommoney Wu | Structural Representative | Caltrans SR DB |
| dylan.larose@dot.ca.gov | Dylan Larose | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 16 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2026-04-17-2 | 04/17/2026 | 04/17/2026 | Quality Assurance | Concrete | View |
| 2026-04-17-1 | 04/17/2026 | 04/21/2026 | Quality Assurance | Concrete | View |
| 2026-03-31-27 | 03/31/2026 | 04/01/2026 | Quality Control | Polyester | View |
| 2026-04-08-1 | 04/08/2026 | 04/09/2026 | Quality Assurance | Concrete | View |
| 2025-10-06-111 | 10/06/2025 | 10/06/2025 | Quality Assurance | Aggregate | View |
| 2025-10-21-75 | 10/21/2025 | 10/21/2025 | Quality Assurance | Aggregate | View |
| 2026-02-12-36 | 02/12/2026 | 02/13/2026 | Quality Control | Aggregate | View |
| 2026-02-13-46 | 02/13/2026 | 02/13/2026 | Quality Assurance | Concrete | View |
| 2026-01-20-14 | 01/20/2026 | 01/20/2026 | Quality Assurance | Soil | View |
| 2025-12-31-1 | 12/31/2025 | 02/01/2026 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|