Project Details
This page displays current information for project DEA: 101L2804.
Project Information
| Project Identifiers | Project ID: 1000760 DEA: 101L2804 EFIS: 1020000103 |
|---|---|
| DIST-CO-RTE-PM | 10-SJ-4-20.5/20.8 |
| Award Date | 01/28/2025 |
| Closeout Date | Not set |
| Work Description | INSTALL LEFT-TURN CHANNELIZATION. |
| Location Description | SAN JOAQUIN COUNTY NEAR STOCKTON FROM 0.2 MILE WEST OF WALKER LANE TO 0.1 MILE EAST OF WALKER LANE |
| QA Service Level | 1 (Verified on 11/12/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| david.abledu@dot.ca.gov | David Abledu | Resident Engineer | Caltrans RE DB |
| justin.palmaymesa@dot.ca.gov | Justin Palmaymesa | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-2 of 2 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-10-30-51 | 10/30/2025 | 11/14/2025 | No Test | Asphalt Binder | View |
| 2025-10-30-50 | 10/30/2025 | 11/14/2025 | Quality Assurance | Asphalt Binder | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
