Project Details
This page displays current information for project DEA: 100P9244.
Project Information
| Project Identifiers | Project ID: 1000710 DEA: 100P9244 EFIS: 1023000226 |
|---|---|
| DIST-CO-RTE-PM | 10-MPA-140-42.0/42.7 |
| Award Date | 08/22/2025 |
| Closeout Date | Not set |
| Work Description | Fergusen Slide Rock Avalanche Shed |
| Location Description | Mariposa County, along Route 140 in the Merced River canyon, about 8 miles east of Briceburg and 7.6 miles west of El Portal. |
| QA Service Level | 1 (Verified on 10/15/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| jonathan.ngai@dot.ca.gov | Jonathan Ngai | Resident Engineer | Caltrans RE DB |
| justin.palmaymesa@dot.ca.gov | Justin Palmaymesa | METS REP | Caltrans METS REP DB |
| mandeep.dhesi@dot.ca.gov | Mandeep Dhesi | District Materials Engineer | Caltrans District Materials Engineer |
Samples
Samples submitted for this project.
Displaying 1-10 of 48 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2026-09-24-4 | 09/24/2026 | Quality Assurance | SMTL TM5 - Threaded Bar | View | |
| 2026-09-18-40 | 09/18/2026 | 09/23/2026 | Quality Assurance | SMTL TM5 - Threaded Bar | View |
| 2026-09-23-1 | 09/23/2026 | 09/30/2026 | Quality Assurance | SMTL TM4 - Prestressing Strand | View |
| 2026-09-18-4 | 09/18/2026 | 09/23/2026 | Quality Assurance | SMTL TM5 - Threaded Bar | View |
| 2026-08-10-83 | 08/10/2026 | 08/10/2026 | Quality Assurance | Cementitious | View |
| 2026-08-10-82 | 08/10/2026 | 08/10/2026 | Quality Assurance | Cementitious | View |
| 2026-08-10-81 | 08/10/2026 | 08/10/2026 | Quality Assurance | Cementitious | View |
| 2026-08-10-80 | 08/10/2026 | 08/10/2026 | Quality Assurance | Cementitious | View |
| 2026-09-03-2 | 09/03/2026 | 09/15/2026 | Quality Assurance | SMTL TM4 - Prestressing Strand | View |
| 2026-07-20-63 | 07/20/2026 | 08/31/2026 | Quality Assurance | SMTL TM5 - Couplers | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
