Project Details
This page displays current information for project DEA: 041Q5824.
Project Information
| Project Identifiers | Project ID: 1000707 DEA: 041Q5824 EFIS: 0421000263 |
|---|---|
| DIST-CO-RTE-PM | 04-SM-101-0/21.8 |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | REHABILITATE PAVEMENT, UPGRADE SIGNS, GUARDRAIL, AND T |
| Location Description | SAN MATEO COUNTY FROM SAN MATEO COUNTY LINE IN EAST PALO ALTO TO 0.2 MILES NORTH OF COLMA CREEK BRIDGE IN SOUTH SAN FRANCISCO. |
| QA Service Level | 1 (Verified on 01/13/2025) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| ethan.malonzo@dot.ca.gov | Ethan Malonzo | Resident Engineer | Caltrans RE DB |
| ricardo.costa@dot.ca.gov | Ricardo Silva Da Costa | Structural Representative | Caltrans SR DB |
| waqas.ather@dot.ca.gov | Waqas Ather | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 10 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2026-04-29-69 | 04/29/2026 | 05/11/2026 | Production Start-Up | Hot Mix Asphalt | View |
| 2026-04-29-68 | 04/29/2026 | 05/11/2026 | Production Start-Up | Aggregate | View |
| 2026-04-15-68 | 04/15/2026 | 05/08/2026 | Production Start-Up | Hot Mix Asphalt | View |
| 2026-04-15-67 | 04/15/2026 | 05/08/2026 | Production Start-Up | Aggregate | View |
| 2026-04-02-126 | 04/02/2026 | 05/07/2026 | Production Start-Up | Hot Mix Asphalt | View |
| 2026-04-02-125 | 04/02/2026 | 05/07/2026 | Production Start-Up | Aggregate | View |
| 2026-06-08-5 | 06/08/2026 | 06/08/2026 | Quality Control | SMTL TM5 - Headed Bars | View |
| 2026-06-08-4 | 06/08/2026 | 06/08/2026 | Quality Control | SMTL TM5 - Headed Bars | View |
| 2026-06-08-2 | 06/08/2026 | 06/15/2026 | Quality Assurance | SMTL TM5 - Headed Bars | View |
| 2026-06-08-1 | 06/08/2026 | 06/15/2026 | Quality Assurance | SMTL TM5 - Headed Bars | View |
Job Mix Formula (JMF)
JMFs associated with this project.
Displaying 1-3 of 3 results.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| JMF3511-318-2026-25 | Submittal Accepted for Verification | CT D04 - Hayward DME / District Laboratory | 05/01/2026 | View | |
| JMF3511-318-2026-23 | Submittal Accepted for Verification | CT D04 - Hayward DME / District Laboratory | 04/30/2026 | View | |
| JMF3511-318-2026-21 | Submittal Accepted for Verification | CT D04 - Hayward DME / District Laboratory | 04/29/2026 | View |
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods