Project Details
This page displays current information for project DEA: 07348204.
Project Information
| Project Identifiers | Project ID: 1000700 DEA: 07348204 EFIS: 0718000137 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-210-R19.4/R27.0 |
| Award Date | 03/17/2025 |
| Closeout Date | Not set |
| Work Description | RESTORE BRIDGE AND DRAINAGE SYSTEM, AND CONSTRUCT STAMPED CONCRETE. |
| Location Description | LOS ANGELES COUNTY IN LA CANADA FLINTRIDGE AND PASADENA AT VARIOUS LOCATIONS FROM 0.1 MILE EAST OF WINERY CANYON FLUME OVERCROSSING TO 0.1 MILE EAST OF HILL AVENUE UNDERCROSSING |
| QA Service Level | 1 (Verified on 11/25/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| danglong.M.Tran@dot.ca.gov | Danglong Tran | Resident Engineer | Caltrans RE DB |
| maziar.kazemian@dot.ca.gov | Maziar Kazemian | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-3 of 3 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-11-05-65 | 11/05/2025 | 11/06/2025 | Acceptance | Concrete | View |
| 2025-10-21-41 | 10/21/2025 | 10/28/2025 | Acceptance | Concrete | View |
| 2025-10-03-53 | 10/03/2025 | 10/04/2025 | Acceptance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
