Project Details

This page displays current information for project DEA: 021J75U4.

Project Information

Project IdentifiersProject ID: 1000697
DEA: 021J75U4
EFIS: 0224000092
DIST-CO-RTE-PM02-LAS-36-14.4/R16.8
Award Date01/23/2025
Closeout DateNot set
Work DescriptionPLACE HMA AND CLASS 2 AB, EXCAVATE ROADWAY, & INSTALL LIGHTING SYSTEM.
Location DescriptionLASSEN COUNTY ABOUT 9 MILES WEST OF SUSANVILLE FROM 1.3 MILES WEST TO 1.2 MILES EAST OF WILLARD CREEK ROAD
QA Service Level1 (Verified on 10/24/2024)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
daniel.gibbs@dot.ca.govDaniel GibbsResident EngineerCaltrans RE DB
peter.gan@dot.ca.govPeter GanMETS REPCaltrans METS REP DB

Samples

Samples submitted for this project.

Displaying 1-10 of 27 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
   
2026-07-07-9207/07/202607/08/2026AcceptanceSoilView
2026-06-23-5206/23/202606/24/2026AcceptanceSoilView
2025-07-28-4407/28/202507/28/2025Quality ControlAggregateView
2025-08-01-708/01/202508/01/2025Quality ControlPrecast ConcreteView
2025-07-31-2107/31/202507/31/2025Quality ControlPrecast ConcreteView
2025-07-30-3507/30/202507/30/2025Quality ControlPrecast ConcreteView
2025-07-29-4307/29/202507/29/2025Quality ControlPrecast ConcreteView
2025-07-28-3007/28/202507/24/2025Quality ControlPrecast ConcreteView
2025-07-24-2907/24/202507/24/2025Quality ControlPrecast ConcreteView
2025-07-23-4307/23/202507/23/2025Quality ControlPrecast ConcreteView

Job Mix Formula (JMF)

JMFs associated with this project.

Displaying 1-1 of 1 result.
JMF IDStatusSubmitted ByCreated ByDate CreatedLink
JMF3511-22-2026-27Submittal Authorized For Use CT D02 - Redding Northern Regional Laboratory05/05/2026View

Precast Concrete Forms

Project DEADIME Sample IDSample Taken DateLink
021J75U42025-08-01-708/01/2025View
021J75U42025-07-31-2107/31/2025View
021J75U42025-07-30-3507/30/2025View
021J75U42025-07-29-4307/29/2025View
021J75U42025-07-28-3007/28/2025View
021J75U42025-07-24-2907/24/2025View
021J75U42025-07-23-4307/23/2025View
021J75U42025-07-22-4407/22/2025View
021J75U42025-07-22-107/22/2025View
021J75U42025-07-21-207/21/2025View

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods