Project Details
This page displays current information for project DEA: 11056404.
Project Information
| Project Identifiers | Project ID: 1000683 DEA: 11056404 EFIS: 1124000359 |
|---|---|
| DIST-CO-RTE-PM | 11-SD-11-0.6/2.7 |
| Award Date | 12/20/2024 |
| Closeout Date | Not set |
| Work Description | PERFORM GRADING, CONSTRUCT DRAINAGE FACILITIES, SIGNS AND STRIPING. |
| Location Description | SAN DIEGO COUNTY NEAR SAN DIEGO FROM 0.2 MILE WEST OF SANYO AVENUE UNDERCROSSING TO 0.2 MILE EAST OF SIEMPRE VIVA ROAD OVERCROSSING |
| QA Service Level | 1 (Verified on 01/17/2025) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| julien.atallah@dot.ca.gov | Julien Atallah | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 67 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-12-04-19 | 12/04/2025 | 12/04/2025 | Quality Assurance | Soil | View |
| 2025-12-03-30 | 12/03/2025 | 12/03/2025 | Quality Assurance | Soil | View |
| 2025-12-02-23 | 12/02/2025 | 12/02/2025 | Quality Assurance | Soil | View |
| 2025-07-02-80 | 07/02/2025 | 07/03/2025 | Quality Control | Concrete | View |
| 2025-06-19-119 | 06/19/2025 | 06/20/2025 | Quality Control | Concrete | View |
| 2025-06-19-118 | 06/19/2025 | 06/20/2025 | Quality Control | Concrete | View |
| 2025-06-11-120 | 06/11/2025 | 06/12/2025 | Quality Control | Concrete | View |
| 2025-06-02-134 | 06/02/2025 | 06/30/2025 | Quality Control | Concrete | View |
| 2025-06-02-133 | 06/02/2025 | 06/30/2025 | Quality Control | Concrete | View |
| 2025-12-01-20 | 12/01/2025 | 12/01/2025 | Quality Assurance | Soil | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
