Project Details

This page displays current information for project DEA: 081J7204.

Project Information

Project IdentifiersProject ID: 1000681
DEA: 081J7204
EFIS: 0818000099
DIST-CO-RTE-PM08-SBD-40-S0.0/S0.8,0.0/R15.0
Award Date01/17/2025
Closeout Date09/03/2026
Work DescriptionREPLACE AC SURFACING, COLD PLANE AC PAVEMENT, HMA, RSP, AND MGS.
Location DescriptionSAN BERNARDINO COUNTY IN AND NEAR BARSTOW FROM 0.1 MILE WEST OF ROBERTA STREET TO MONTARA ROAD AND FROM ROUTE 15 TO 0.4 MILE EAST OF LAVA WASH BRIDGE
QA Service Level1 (Verified on 01/13/2025)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
khoa.n.nguyen@dot.ca.govKhoa NguyenResident EngineerCaltrans RE DB
prakash.gowda@dot.ca.govPrakash GowdaDistrict Materials Engineer - Field Lab FontanaCaltrans District Materials Engineer
zihui.li@dot.ca.govZihui LiDistrict Materials Engineer - SRL PCC/Agg/Soils LabCaltrans District Materials Engineer
cristina.paredes@dot.ca.govCristina ParedesDistrict Materials Engineer - SRL HMA and Binder LabsCaltrans District Materials Engineer
sittampalam.sathiskumar@dot.ca.govSittampalam SathiskumarDistrict Materials Engineer - DesignCaltrans District Materials Engineer
kaushalkumar.talati@dot.ca.govKaushalkumar TalatiDistrict Materials Engineer - Field Lab Barstow and HesperiaCaltrans District Materials Engineer
brian.teh@dot.ca.govBrian TehDistrict Materials Engineer - SRL STS and Field Lab BlytheCaltrans District Materials Engineer

Samples

Samples submitted for this project.

Displaying 1-10 of 236 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
   
2025-06-11-13006/11/202506/13/2025VerificationAsphalt Rubber BinderView
2025-06-11-12906/11/202506/13/2025VerificationAsphalt BinderView
2025-08-11-9508/11/202508/13/2025VerificationAsphalt Rubber BinderView
2025-08-11-9408/11/202508/13/2025VerificationAsphalt BinderView
2025-07-16-15407/16/202507/17/2025VerificationAsphalt BinderView
2025-07-16-15307/16/202507/17/2025VerificationAsphalt Rubber BinderView
2025-07-14-16707/14/202507/16/2025VerificationAsphalt Rubber BinderView
2025-07-14-16607/14/202507/16/2025VerificationAsphalt BinderView
2025-07-07-9407/07/202507/09/2025VerificationAsphalt Rubber BinderView
2025-07-07-9307/07/202507/09/2025VerificationAsphalt BinderView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Precast Concrete Forms

Project DEADIME Sample IDSample Taken DateLink
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods