Project Details
This page displays current information for project DEA: 024H03U4.
Project Information
| Project Identifiers | Project ID: 1000636 DEA: 024H03U4 EFIS: 0224000026 |
|---|---|
| DIST-CO-RTE-PM | 02-PLU-89-12.9/20.0,20.6/21.0 |
| Award Date | 12/20/2024 |
| Closeout Date | Not set |
| Work Description | HMA OVERLAY. |
| Location Description | PLUMAS COUNTY IN AND NEAR GREENVILLE FROM 0.8 MILE SOUTH OF DIXIE CANYON ROAD TO WOLF CREEK BRIDGE AND FROM MILL STREET TO 0.4 MILE NORTH OF HILLSIDE DRIVE |
| QA Service Level | 1 (Verified on 09/24/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| damion.farley@dot.ca.gov | Damion Farley | Resident Engineer | Caltrans RE DB |
| peter.gan@dot.ca.gov | Peter Gan | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 21 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-07-28-56 | 07/28/2025 | 08/22/2025 | Verification | Hot Mix Asphalt | View |
| 2025-08-07-55 | 08/07/2025 | 08/22/2025 | Verification | Hot Mix Asphalt | View |
| 2025-07-28-53 | 07/28/2025 | 08/22/2025 | Verification | Hot Mix Asphalt | View |
| 2025-08-06-72 | 08/06/2025 | 08/22/2025 | Verification | Hot Mix Asphalt | View |
| 2025-07-29-87 | 07/29/2025 | 08/11/2025 | Preliminary | Hot Mix Asphalt | View |
| 2025-08-01-52 | 08/01/2025 | 08/11/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-07-31-53 | 07/31/2025 | 08/11/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-07-30-60 | 07/30/2025 | 08/11/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-08-01-48 | 08/01/2025 | 08/11/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-07-31-49 | 07/31/2025 | 08/01/2025 | Acceptance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
