Project Details
This page displays current information for project DEA: 120R32U4.
Project Information
| Project Identifiers | Project ID: 1000611 DEA: 120R32U4 EFIS: 1222000054 |
|---|---|
| DIST-CO-RTE-PM | 12-ORA-55-0.2/R17.8 |
| Award Date | 02/07/2025 |
| Closeout Date | Not set |
| Work Description | COLD PLANE, PLACE RHMA, REPLACE CB, SIGNS AND MODIFY LIGHTING SYSTEM. |
| Location Description | ORANGE COUNTY FROM 0.1 MILE SOUTH OF ROUTE 55/1 SEPARATION IN NEWPORT BEACH TO ROUTE 55/91 SEPARATION IN ANAHEIM |
| QA Service Level | 1 (Verified on 09/30/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| tyrone.taylor@dot.ca.gov | Tyrone Taylor | Resident Engineer | Caltrans RE DB |
| Matthew.Chang@dot.ca.gov | Matthew Chang | Structural Representative | Caltrans SR DB |
| eric.tsang@dot.ca.gov | Eric Tsang | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 33 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2026-07-14-33 | 07/14/2026 | 07/14/2026 | Stock | SMTL TM3 - Fastener Assembly | View |
| 2026-07-14-30 | 07/14/2026 | 07/14/2026 | Stock | SMTL TM3 - Fastener Assembly | View |
| 2026-07-14-29 | 07/14/2026 | 07/14/2026 | Stock | SMTL TM3 - Fastener Assembly | View |
| 2026-07-14-24 | 07/14/2026 | 07/14/2026 | Stock | SMTL TM3 - Fastener Assembly | View |
| 2026-06-17-4 | 06/17/2026 | 06/29/2026 | Stock | SMTL TM3 - Fastener Assembly | View |
| 2026-06-17-3 | 06/17/2026 | 06/26/2026 | Stock | SMTL TM3 - Fastener Assembly | View |
| 2026-06-16-31 | 06/16/2026 | 06/26/2026 | Stock | SMTL TM3 - Fastener Assembly | View |
| 2026-06-16-30 | 06/16/2026 | 06/29/2026 | Stock | SMTL TM3 - Fastener Assembly | View |
| 2026-06-16-29 | 06/16/2026 | 06/26/2026 | Stock | SMTL TM3 - Fastener Assembly | View |
| 2026-06-16-28 | 06/16/2026 | 06/26/2026 | Stock | SMTL TM3 - Fastener Assembly | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
