Project Details
This page displays current information for project DEA: 120R32U4.
Project Information
| Project Identifiers | Project ID: 1000611 DEA: 120R32U4 EFIS: 1222000054 |
|---|---|
| DIST-CO-RTE-PM | 12-ORA-55-0.2/R17.8 |
| Award Date | 02/07/2025 |
| Closeout Date | Not set |
| Work Description | COLD PLANE, PLACE RHMA, REPLACE CB, SIGNS AND MODIFY LIGHTING SYSTEM. |
| Location Description | ORANGE COUNTY FROM 0.1 MILE SOUTH OF ROUTE 55/1 SEPARATION IN NEWPORT BEACH TO ROUTE 55/91 SEPARATION IN ANAHEIM |
| QA Service Level | 1 (Verified on 09/30/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| tyrone.taylor@dot.ca.gov | Tyrone Taylor | Resident Engineer | Caltrans RE DB |
| Matthew.Chang@dot.ca.gov | Matthew Chang | Structural Representative | Caltrans SR DB |
| scott.bauer@dot.ca.gov | Scott Bauer | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 12 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-11-20-4 | 11/20/2025 | 11/26/2025 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2025-09-29-2 | 09/29/2025 | 10/13/2025 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2025-09-29-1 | 09/29/2025 | 10/13/2025 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2025-09-26-3 | 09/26/2025 | Quality Assurance | SMTL TM3 - Fastener Assembly | View | |
| 2025-09-05-54 | 09/05/2025 | 09/11/2025 | Verification | Asphalt Rubber Binder | View |
| 2025-09-09-58 | 09/09/2025 | 09/12/2025 | Verification | Asphalt Binder | View |
| 2025-09-05-50 | 09/05/2025 | 09/11/2025 | Verification | Asphalt Binder | View |
| 2025-09-08-31 | 09/08/2025 | 09/12/2025 | Verification | Aggregate | View |
| 2025-09-08-26 | 09/08/2025 | 09/12/2025 | Verification | Hot Mix Asphalt | View |
| 2025-09-05-44 | 09/05/2025 | 09/11/2025 | Verification | Crumb Rubber Modifier | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
