Project Details
This page displays current information for project DEA: 071XW104.
Project Information
| Project Identifiers | Project ID: 1000580 DEA: 071XW104 EFIS: 0723000028 |
|---|---|
| DIST-CO-RTE-PM | 07--- |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | VENTURA COUNTY IN CITY OF FILLMORE VEN-126REPLACE/CONSTRUCT THE FILLMORE MAINTENANCESTATION DAMAGED BY HIGH WINDS DIR\\'S EMERGENCY |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 09/09/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| alfred.ira@dot.ca.gov | ALFRED IRA | Resident Engineer | Caltrans RE DB |
| heidi.bernstein@dot.ca.gov | Heidi Bernstein | Structural Representative | Caltrans SR DB |
| jennifer.olarte@dot.ca.gov | Jennifer Olarte | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 10 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-10-10-39 | 10/10/2025 | 10/13/2025 | Acceptance | Concrete | View |
| 2025-06-17-116 | 06/17/2025 | 06/20/2025 | Acceptance | Concrete | View |
| 2025-04-11-3 | 04/11/2025 | 04/17/2025 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2025-01-09-57 | 01/09/2025 | 01/09/2025 | Acceptance | Soil | View |
| 2025-01-28-20 | 01/28/2025 | 01/30/2025 | Acceptance | Concrete | View |
| 2024-12-23-37 | 12/23/2024 | 12/23/2024 | Acceptance | Soil | View |
| 2024-11-14-66 | 11/14/2024 | 11/14/2024 | Acceptance | Soil | View |
| 2024-11-20-46 | 11/20/2024 | 11/25/2024 | Acceptance | Concrete | View |
| 2024-11-14-49 | 11/14/2024 | 11/19/2024 | Informational | Concrete | View |
| 2024-11-13-1 | 11/13/2024 | 12/03/2024 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
