Project Details
This page displays current information for project DEA: 033J7504.
Project Information
| Project Identifiers | Project ID: 1000564 DEA: 033J7504 EFIS: 0322000312 |
|---|---|
| DIST-CO-RTE-PM | 03-PLA-49-4.6/4.9 |
| Award Date | 10/30/2024 |
| Closeout Date | Not set |
| Work Description | CONSTRUCT SIDEWALKS, CURB RAMPS, AND COLD PLANE AC PAVEMENT. |
| Location Description | PLACER COUNTY NEAR AUBURN FROM EDGEWOOD ROAD TO SUMMER RIDGE DRIVE |
| QA Service Level | 1 (Verified on 09/17/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| brigette.haddock@dot.ca.gov | Brigette Haddock | Resident Engineer | Caltrans RE DB |
| farzan.kazemi@dot.ca.gov | Farzan Kazemi | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-1 of 1 result.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-05-29-52 | 05/29/2025 | 06/02/2025 | Quality Assurance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
