Project Details
This page displays current information for project DEA: 010J8904.
Project Information
| Project Identifiers | Project ID: 1000561 DEA: 010J8904 EFIS: 0119000119 |
|---|---|
| DIST-CO-RTE-PM | 01-HUM-36-3.9/6.0 |
| Award Date | 12/06/2024 |
| Closeout Date | Not set |
| Work Description | HOT MIX ASPHALT, AGGREGATE BASE, AND STRUCTURAL CONCRETE. |
| Location Description | HUMBOLDT COUNTY AT CARLOTTA FROM 0.2 MILE WEST OF FISHER ROAD TO 0.2 MILE WEST OF WILDER ROAD |
| QA Service Level | 1 (Verified on 09/23/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| cody.long@dot.ca.gov | Cody Long | Resident Engineer | Caltrans RE DB |
| shantanu.nalawade@dot.ca.gov | Shantanu Nalawade | Structural Representative | Caltrans SR DB |
| peter.gan@dot.ca.gov | Peter Gan | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 73 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-11-06-31 | 11/06/2025 | 11/06/2025 | Quality Control | Precast Concrete | View |
| 2025-11-04-27 | 11/04/2025 | 11/04/2025 | Quality Control | Precast Concrete | View |
| 2025-10-24-29 | 10/24/2025 | 10/24/2025 | Quality Control | Precast Concrete | View |
| 2025-10-31-21 | 10/31/2025 | 11/03/2025 | Quality Assurance | SMTL TM1 - Elastomeric Bearing Pad | View |
| 2025-10-23-23 | 10/23/2025 | 10/23/2025 | Quality Control | Aggregate | View |
| 2025-10-23-22 | 10/23/2025 | 10/23/2025 | Quality Control | Aggregate | View |
| 2025-10-23-21 | 10/23/2025 | 10/23/2025 | Quality Control | Aggregate | View |
| 2025-10-20-14 | 10/20/2025 | 10/20/2025 | Quality Control | Precast Concrete | View |
| 2025-10-17-20 | 10/17/2025 | 10/17/2025 | Quality Control | Precast Concrete | View |
| 2025-10-15-29 | 10/15/2025 | 10/15/2025 | Quality Control | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
