Project Details
This page displays current information for project DEA: 081J6104.
Project Information
| Project Identifiers | Project ID: 1000501 DEA: 081J6104 EFIS: 0818000102 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-215-40.5/42.7 |
| Award Date | 11/05/2024 |
| Closeout Date | Not set |
| Work Description | INDIVIDUAL SLAB REPLACEMENT (RSC), RHMA, AND REPLACE BASE. |
| Location Description | RIVERSIDE COUNTY IN RIVERSIDE FROM 0.8 MILE SOUTH OF ROUTE 60/91 SEPARATION TO 0.4 MILE SOUTH OF MARTIN LUTHER KING BOULEVARD UNDERCROSSING |
| QA Service Level | 1 (Verified on 09/02/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| mahfual.alam@dot.ca.gov | Mahfual Alam | Resident Engineer | Caltrans RE DB |
| james.devey@dot.ca.gov | James Devey | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 46 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-12-03-29 | 12/03/2025 | 12/05/2025 | Quality Assurance | Concrete | View |
| 2025-12-04-18 | 12/04/2025 | 12/05/2025 | Quality Assurance | Concrete | View |
| 2025-12-03-17 | 12/03/2025 | 12/04/2025 | Quality Assurance | Concrete | View |
| 2025-12-02-17 | 12/02/2025 | 12/04/2025 | Quality Assurance | Concrete | View |
| 2025-11-24-18 | 11/24/2025 | 11/25/2025 | Quality Assurance | Concrete | View |
| 2025-11-25-14 | 11/25/2025 | 11/26/2025 | Quality Assurance | Concrete | View |
| 2025-11-21-7 | 11/21/2025 | 11/24/2025 | Quality Assurance | Concrete | View |
| 2025-11-19-27 | 11/19/2025 | 11/20/2025 | Quality Assurance | Concrete | View |
| 2025-11-18-35 | 11/18/2025 | 11/06/2025 | Quality Assurance | Concrete | View |
| 2025-11-05-37 | 11/05/2025 | 11/06/2025 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
