Project Details
This page displays current information for project DEA: 081J6104.
Project Information
| Project Identifiers | Project ID: 1000501 DEA: 081J6104 EFIS: 0818000102 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-215-40.5/42.7 |
| Award Date | 11/05/2024 |
| Closeout Date | Not set |
| Work Description | INDIVIDUAL SLAB REPLACEMENT (RSC), RHMA, AND REPLACE BASE. |
| Location Description | RIVERSIDE COUNTY IN RIVERSIDE FROM 0.8 MILE SOUTH OF ROUTE 60/91 SEPARATION TO 0.4 MILE SOUTH OF MARTIN LUTHER KING BOULEVARD UNDERCROSSING |
| QA Service Level | 1 (Verified on 09/02/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| mahfual.alam@dot.ca.gov | Mahfual Alam | Resident Engineer | Caltrans RE DB |
| james.devey@dot.ca.gov | James Devey | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 120 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2026-01-12-16 | 01/12/2026 | 01/13/2026 | Acceptance | Aggregate | View |
| 2026-01-08-21 | 01/08/2026 | 01/09/2026 | Acceptance | Aggregate | View |
| 2026-01-07-30 | 01/07/2026 | 01/08/2026 | Acceptance | Aggregate | View |
| 2026-01-06-11 | 01/06/2026 | 01/07/2026 | Acceptance | Aggregate | View |
| 2025-12-18-83 | 12/18/2025 | 12/19/2025 | Acceptance | Aggregate | View |
| 2025-12-17-42 | 12/17/2025 | 12/18/2025 | Acceptance | Aggregate | View |
| 2025-12-16-63 | 12/16/2025 | 12/17/2025 | Acceptance | Aggregate | View |
| 2025-12-15-39 | 12/15/2025 | 12/16/2025 | Acceptance | Aggregate | View |
| 2025-12-12-44 | 12/12/2025 | 12/15/2025 | Acceptance | Aggregate | View |
| 2025-12-11-42 | 12/11/2025 | 12/12/2025 | Acceptance | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
