Project Details
This page displays current information for project DEA: 120S1104.
Project Information
| Project Identifiers | Project ID: 1000416 DEA: 120S1104 EFIS: 1219000091 |
|---|---|
| DIST-CO-RTE-PM | 12-ORA-22-R0.9/R9.4 |
| Award Date | 09/04/2024 |
| Closeout Date | Not set |
| Work Description | REPLACE CONCRETE BARRIER AND MODIFY LIGHTING SYSTEM. |
| Location Description | ORANGE FROM BOLSA CHICA ROAD OVERCROSSING IN GARDEN GROVE TO LEWIS STREET OVERCROSSING IN ORANGE |
| QA Service Level | 1 (Verified on 08/05/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| aghiam@fountainheadcorp.com | Arezo Ghiam | Resident Engineer | Caltrans RE DB |
| Maheshwarlal.Kapoor@dot.ca.gov | Maheshwarlal Kapoor | Structural Representative | Caltrans SR DB |
| scott.bauer@dot.ca.gov | Scott Bauer | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 16 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-10-29-38 | 10/29/2025 | 10/30/2025 | Quality Assurance | Concrete | View |
| 2025-09-22-67 | 09/22/2025 | 09/23/2025 | Quality Assurance | Concrete | View |
| 2025-08-05-65 | 08/05/2025 | 08/06/2025 | Quality Assurance | Concrete | View |
| 2025-07-21-35 | 07/21/2025 | 07/22/2025 | Quality Assurance | Concrete | View |
| 2025-07-21-34 | 07/21/2025 | 07/22/2025 | Quality Assurance | Concrete | View |
| 2025-07-17-61 | 07/17/2025 | 07/18/2025 | Quality Assurance | Concrete | View |
| 2025-06-25-65 | 06/25/2025 | 06/26/2025 | Quality Assurance | Concrete | View |
| 2025-05-29-56 | 05/29/2025 | 05/30/2025 | Quality Assurance | Concrete | View |
| 2025-05-23-22 | 05/23/2025 | 05/27/2025 | Quality Assurance | Concrete | View |
| 2025-04-18-36 | 04/18/2025 | 04/21/2025 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
