Project Details
This page displays current information for project DEA: 120K91U4.
Project Information
| Project Identifiers | Project ID: 1000403 DEA: 120K91U4 EFIS: 1222000031 |
|---|---|
| DIST-CO-RTE-PM | 12-ORA-91-R9.2/R11.4 |
| Award Date | 01/03/2025 |
| Closeout Date | Not set |
| Work Description | CONST BRIDGES, RW, SW, PAVEMENT, DRAINAGE AND ELECTRICAL SYSTEMS. |
| Location Description | ORANGE COUNTY IN ANAHEIM FROM 0.9 MILE WEST TO 1.3 MILES EAST OF LAKEVIEW AVENUE OVERCROSSING |
| QA Service Level | 1 (Verified on 08/19/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| Steve.Kinaly@wsp.com | Steve Kinaly | Resident Engineer | Caltrans RE DB |
| wei-jen.lee@bureauveritas.com | Wei-Jen Lee | Structural Representative | Caltrans SR DB |
| scott.bauer@dot.ca.gov | Scott Bauer | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 185 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2026-01-07-2 | 01/07/2026 | Quality Control | SMTL TM5 - Headed Bars | View | |
| 2026-01-07-1 | 01/07/2026 | 01/08/2026 | Quality Assurance | SMTL TM5 - Headed Bars | View |
| 2025-12-22-19 | 12/22/2025 | 12/22/2025 | Quality Control | Aggregate | View |
| 2025-12-22-18 | 12/22/2025 | 12/23/2025 | Quality Control | Concrete | View |
| 2025-12-19-12 | 12/19/2025 | 12/20/2025 | Quality Control | Concrete | View |
| 2025-12-19-11 | 12/19/2025 | 12/20/2025 | Quality Control | Concrete | View |
| 2025-12-19-10 | 12/19/2025 | 12/20/2025 | Quality Control | Concrete | View |
| 2025-12-18-56 | 12/18/2025 | 12/18/2025 | Quality Control | Aggregate | View |
| 2025-12-18-55 | 12/18/2025 | 12/18/2025 | Quality Control | Concrete | View |
| 2025-12-18-54 | 12/18/2025 | 12/18/2025 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
