Project Details
This page displays current information for project DEA: 07349904.
Project Information
| Project Identifiers | Project ID: 1000392 DEA: 07349904 EFIS: 0718000167 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-710-6.0/14.1 |
| Award Date | 09/12/2024 |
| Closeout Date | Not set |
| Work Description | CONSTRUCT MVPS, MGS, ROCK BLANKETS,AND PAVE BEYOND THE GORE. |
| Location Description | LOS ANGELES COUNTY IN LONG BEACH AND COMPTOM FROM SHORELINE DRIVE TO 0.2 MILE NORTH OF ALONDRA BOULEVARD OVERCROSSING |
| QA Service Level | 1 (Verified on 08/12/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| jeffrey.townsend@dot.ca.gov | Jeffrey Townsend | Resident Engineer | Caltrans RE DB |
| jennifer.olarte@dot.ca.gov | Jennifer Olarte | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 24 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-09-03-60 | 09/03/2025 | 09/10/2025 | Verification | Asphalt Binder | View |
| 2025-09-03-56 | 09/03/2025 | 09/10/2025 | Verification | Asphalt Rubber Binder | View |
| 2025-09-03-48 | 09/03/2025 | 09/10/2025 | Verification | Asphalt Binder | View |
| 2025-08-03-22 | 08/03/2025 | 09/10/2025 | Verification | Crumb Rubber Modifier | View |
| 2025-09-03-45 | 09/03/2025 | 09/10/2025 | Production Start-Up | Hot Mix Asphalt | View |
| 2025-09-03-44 | 09/03/2025 | 09/10/2025 | Production Start-Up | Hot Mix Asphalt | View |
| 2025-09-03-43 | 09/03/2025 | 09/10/2025 | Verification | Aggregate | View |
| 2025-06-06-51 | 06/06/2025 | 06/10/2025 | Acceptance | Aggregate | View |
| 2025-06-09-13 | 06/09/2025 | 06/09/2025 | Acceptance | Soil | View |
| 2025-06-05-1 | 06/05/2025 | 06/05/2025 | Acceptance | Soil | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods