Project Details
This page displays current information for project DIME:1000383.
Project Information
Project Identifiers | Project ID: 1000383 Permit Numbers: 04226DP2005 |
---|---|
DIST-CO-RTE-PM | 04-SM-- |
Award Date | Not set |
Closeout Date | Not set |
Work Description | removal and replacement of the existing concrete sidewalk along Woodside Road and the removal and replacement of the two ADA Curb Ramps at the intersection of Woodside Road and Massachusetts Avenue |
Location Description | Redwood City |
QA Service Level | 1 (Verified on 06/12/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
arvind.sidhu@dot.ca.gov | Arvind Sindhu | Resident Engineer | Caltrans RE DB |
saman.barzegari@dot.ca.gov | Saman Barzegari | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods