Project Details
This page displays current information for project DEA: 07298804.
Project Information
Project Identifiers | Project ID: 1000362 DEA: 07298804 EFIS: 0713000283 COOP: 075055 |
---|---|
DIST-CO-RTE-PM | 07-LA-14-59.1 |
Award Date | 04/05/2024 |
Closeout Date | Not set |
Work Description | Widening of mainline, on- and off-ramps, C&G, sidewalks, RW, drainage, signal and lighting, irrigation, landscape, signing, and striping |
Location Description | SR-14 at Palmdale Blvd Interchange PM 59.1 to 60.2, Palmdale Blvd (SR-138) PM 43.3 to 43.7 |
QA Service Level | 2 (Verified on 05/31/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
ramy.beshara@dot.ca.gov | Ramy Beshara | Resident Engineer | Caltrans RE DB |
abdul.khan@psomas.com | Mohammed Khan | Oversight Resident Engineer | Caltrans REO DB |
jennifer.olarte@dot.ca.gov | Jennifer Olarte | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Displaying 1-2 of 2 results.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
4790372675.101.1 | Carbon Steel Rebar | Nucor Steel, Incorporated - Plymouth | Next Century Rebar (Brandon Sullivan) | 27000 LBS |
EPD-191 | Carbon Steel Rebar | CMC Steel Arizona | Next Century Rebar (Brandon Sullivan) | 27000 LBS |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods