Project Details
This page displays current information for project DEA: 07301604.
Project Information
| Project Identifiers | Project ID: 1000315 DEA: 07301604 EFIS: 0714000024 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-91,110,710-Var |
| Award Date | 07/31/2024 |
| Closeout Date | Not set |
| Work Description | INSTALL FIBER REINFORCED POLYMER SYSTEM (COLUMN) AND COLUMN CASING. |
| Location Description | LOS ANGELES COUNTY AT VARIOUS LOCATIONS |
| QA Service Level | 1 (Verified on 05/13/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| ramon.robillos@dot.ca.gov | Ramon Robillos | Resident Engineer | Caltrans RE DB |
| Anayo.Ukwuani@dot.ca.gov | Anayo Ukwuani | Structural Representative | Caltrans SR DB |
| jennifer.olarte@dot.ca.gov | Jennifer Olarte | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 16 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-10-07-118 | 10/07/2025 | 10/08/2025 | Quality Control | Concrete | View |
| 2025-10-30-91 | 10/30/2025 | 11/01/2025 | Quality Control | Aggregate | View |
| 2025-11-01-25 | 11/01/2025 | 11/02/2025 | Quality Control | Aggregate | View |
| 2025-10-31-64 | 10/31/2025 | 11/01/2025 | Quality Control | Aggregate | View |
| 2025-10-24-71 | 10/24/2025 | 10/25/2025 | Quality Control | Aggregate | View |
| 2025-10-23-83 | 10/23/2025 | 10/24/2025 | Quality Control | Aggregate | View |
| 2025-10-08-109 | 10/08/2025 | 10/09/2025 | Quality Control | Concrete | View |
| 2025-10-04-22 | 10/04/2025 | 10/05/2025 | Quality Control | Concrete | View |
| 2025-10-01-115 | 10/01/2025 | 10/02/2025 | Quality Control | Aggregate | View |
| 2025-10-02-82 | 10/02/2025 | 10/03/2025 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
