Project Details
This page displays current information for project DEA: 010P0704.
Project Information
Project Identifiers | Project ID: 1000297 DEA: 010P0704 EFIS: 0124000162 |
---|---|
DIST-CO-RTE-PM | 01-MEN-1-82.1/92.9 |
Award Date | 03/18/2024 |
Closeout Date | Not set |
Work Description | Major items of work include traffic control, reconstruct and stabilize roadway, install micropiles, roadway excavation, repair retaining wall, repair viaduct, restore drainage systems, erosion control and additional work as necessary. |
Location Description | In Mendocino Bounty near Rockport from 9 miles South of Juan Creek Bridge to Juan Creek Bridge. |
QA Service Level | 1 (Verified on 04/25/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
roozbeh.hadipour@dot.ca.gov | Roozbeh Hadipour | Resident Engineer | Caltrans RE DB |
j.sanchez.ramos@dot.ca.gov | Juan Sanchez Ramos | Structural Representative | Caltrans SR DB |
peter.gan@dot.ca.gov | Peter Gan | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-5 of 5 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-11-26-2 | 11/26/2024 | 12/12/2024 | Acceptance | SMTL TM3 - Fastener Assembly | View |
2024-10-18-43 | 10/18/2024 | 10/24/2024 | Quality Assurance | SMTL TM5 - Couplers | View |
2024-10-18-42 | 10/18/2024 | 10/24/2024 | Quality Assurance | SMTL TM5 - Couplers | View |
2024-10-18-41 | 10/18/2024 | 10/24/2024 | Quality Assurance | SMTL TM5 - Couplers | View |
2024-10-18-40 | 10/18/2024 | 10/24/2024 | Quality Assurance | SMTL TM5 - Couplers | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods