Project Details
This page displays current information for project DEA: 070W9004.
Project Information
| Project Identifiers | Project ID: 1000288 DEA: 070W9004 EFIS: 0723000096 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-71-R1.5/1.6 |
| Award Date | 06/24/2024 |
| Closeout Date | 07/24/2025 |
| Work Description | SLURRY SEAL. |
| Location Description | LOS ANGELES COUNTY IN POMONA FROM VALLEY BOULEVARD UNDERCROSSING TO MISSION BOULEVARD OVERCROSSING |
| QA Service Level | 1 (Verified on 09/16/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| jose.j.barbosa@dot.ca.gov | Jose Barbosa | Resident Engineer | Caltrans RE DB |
| nader.gobran@dot.ca.gov | Nader Gobran | District Materials Engineer - Design | Caltrans District Materials Engineer |
| huey-min.tzou@dot.ca.gov | Huey-Min Tzou | District Materials Engineer - Field Tests | Caltrans District Materials Engineer |
| victor.zengler@dot.ca.gov | Victor Zengler | District Materials Engineer - Plant Services QC/QA | Caltrans District Materials Engineer |
Samples
Samples submitted for this project.
Displaying 1-3 of 3 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2024-10-04-72 | 10/04/2024 | 10/07/2024 | Verification | Asphalt Binder | View |
| 2024-10-04-17 | 10/04/2024 | 10/07/2024 | Production Start-Up | Hot Mix Asphalt | View |
| 2024-10-04-10 | 10/04/2024 | 10/07/2024 | Production Start-Up | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
