Project Details
This page displays current information for project DEA: 120S2804.
Project Information
| Project Identifiers | Project ID: 1000256 DEA: 120S2804 EFIS: 1220000014 |
|---|---|
| DIST-CO-RTE-PM | 12-ORA-5-9.6/10.4 |
| Award Date | 06/24/2024 |
| Closeout Date | Not set |
| Work Description | ADD SECONDARY AUXILIARY LANE. |
| Location Description | ORANGE COUNTY IN SAN JUAN CAPISTRANO FROM ROUTE 74/5 SEPARATION TO 0.5 MILE SOUTH OF JUNIPERO SERRA ROAD UNDERCROSSING |
| QA Service Level | 1 (Verified on 05/14/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| zaid.hilli@dot.ca.gov | Zaid Hilli | Resident Engineer | Caltrans RE DB |
| Ryan.Bolton@dot.ca.gov | Ryan Bolton | Structural Representative | Caltrans SR DB |
| eric.tsang@dot.ca.gov | Eric Tsang | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 13 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-09-25-137 | 09/25/2025 | 09/26/2025 | Quality Control | Concrete | View |
| 2025-09-29-98 | 09/29/2025 | 09/30/2025 | Quality Control | Concrete | View |
| 2025-09-26-77 | 09/26/2025 | 09/27/2025 | Quality Control | Concrete | View |
| 2025-09-25-131 | 09/25/2025 | 09/26/2025 | Quality Control | Aggregate | View |
| 2025-09-26-75 | 09/26/2025 | 09/27/2025 | Quality Control | Aggregate | View |
| 2025-08-28-117 | 08/28/2025 | 08/29/2025 | Quality Control | Concrete | View |
| 2025-08-28-104 | 08/28/2025 | 08/28/2025 | Quality Control | Aggregate | View |
| 2026-01-16-43 | 01/16/2026 | 01/21/2026 | Quality Assurance | Hot Mix Asphalt | View |
| 2026-01-16-42 | 01/16/2026 | 01/16/2026 | Quality Assurance | Hot Mix Asphalt | View |
| 2025-08-07-72 | 08/07/2025 | 08/07/2025 | Quality Control | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
