Project Details
This page displays current information for project DEA: 081N7504.
Project Information
| Project Identifiers | Project ID: 1000255 DEA: 081N7504 EFIS: 0823000045 |
|---|---|
| DIST-CO-RTE-PM | 08-SBD-138,189-21.4/R37.8,0.0/5.6 |
| Award Date | 06/12/2024 |
| Closeout Date | Not set |
| Work Description | SLURRY SEAL, TWO-COMPONENT PAINT TRAFFIC STRIPE, REPLACE AC SURFACING. |
| Location Description | SAN BERNARDINO COUNTY ON ROUTE 138 FROM BOLINGBROKE ROAD TO ROUTE 18 AND ON ROUTE 189 FROM ROUTE 18 TO ROUTE 173 |
| QA Service Level | 1 (Verified on 05/15/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| md.rahman@dot.ca.gov | Md Rahman | Resident Engineer | Caltrans RE DB |
| jacob.bailey@dot.ca.gov | Jacob Bailey | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 10 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2024-09-24-136 | 09/24/2024 | 09/25/2024 | Verification | Asphalt Binder | View |
| 2024-10-11-58 | 10/11/2024 | 10/11/2024 | Acceptance | Aggregate | View |
| 2024-10-10-42 | 10/10/2024 | 10/10/2024 | Acceptance | Aggregate | View |
| 2024-10-11-16 | 10/11/2024 | 10/14/2024 | Acceptance | Hot Mix Asphalt | View |
| 2024-10-10-12 | 10/10/2024 | 10/11/2024 | Acceptance | Hot Mix Asphalt | View |
| 2024-09-23-68 | 09/23/2024 | 09/25/2024 | Verification | Asphalt Binder | View |
| 2024-09-25-7 | 09/25/2024 | 09/25/2024 | Acceptance | Hot Mix Asphalt | View |
| 2024-09-24-32 | 09/24/2024 | 09/25/2024 | Acceptance | Hot Mix Asphalt | View |
| 2024-09-23-18 | 09/23/2024 | 09/24/2024 | Verification | Aggregate | View |
| 2024-09-23-4 | 09/23/2024 | 09/23/2024 | Production Start-Up | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
