Project Details
This page displays current information for project DEA: 023J3204.
Project Information
| Project Identifiers | Project ID: 1000225 DEA: 023J3204 EFIS: 0222000034 |
|---|---|
| DIST-CO-RTE-PM | 02-TRI-3,36,299-Var |
| Award Date | 06/06/2024 |
| Closeout Date | Not set |
| Work Description | BRIDGE POLYESTER CONCRETE OVERLAY & METHACRYLATE DECK SEAL. |
| Location Description | TRINITY COUNTY AT VARIOUS LOCATIONS |
| QA Service Level | 1 (Verified on 04/08/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| edward.worden@dot.ca.gov | Edward Worden | Resident Engineer | Caltrans RE DB |
| peter.gan@dot.ca.gov | Peter Gan | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 11 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-07-21-64 | 07/21/2025 | 07/25/2025 | Quality Assurance | Asphalt Binder | View |
| 2025-07-21-56 | 07/21/2025 | 07/22/2025 | Production Start-Up | Hot Mix Asphalt | View |
| 2025-07-21-29 | 07/21/2025 | 07/22/2025 | Acceptance | Reclaimed Asphalt Pavement | View |
| 2025-07-21-28 | 07/21/2025 | 07/22/2025 | Acceptance | Aggregate | View |
| 2025-07-21-23 | 07/21/2025 | 07/25/2025 | Quality Assurance | Asphalt Binder | View |
| 2024-10-24-11 | 10/24/2024 | 10/24/2024 | Acceptance | Roadway/Bridge Surface | View |
| 2024-09-26-60 | 09/26/2024 | 09/27/2024 | Quality Control | Polyester | View |
| 2024-09-10-90 | 09/10/2024 | 09/16/2024 | Quality Assurance | Methacrylate | View |
| 2024-09-05-90 | 09/05/2024 | 09/13/2024 | Quality Assurance | Polyester | View |
| 2024-09-05-89 | 09/05/2024 | 09/13/2024 | Quality Assurance | Polyester | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
