Project Details
This page displays current information for project DEA: 010M6804.
Project Information
| Project Identifiers | Project ID: 1000221 DEA: 010M6804 EFIS: 0123000055 |
|---|---|
| DIST-CO-RTE-PM | 01-HUM-36-6.0/13.4 |
| Award Date | 06/12/2024 |
| Closeout Date | 04/22/2025 |
| Work Description | MICRO-SURFACING, LOW CARBON MICRO-SURFACING, AND DELINEATION. |
| Location Description | HUMBOLDT COUNTY NEAR CARLOTTA FROM 0.2 MILE WEST OF WILDER ROAD TO VAN DUZEN RIVER BRIDGE 04-0094 |
| QA Service Level | 1 (Verified on 04/05/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| cody.long@dot.ca.gov | Cody Long | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 11 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2024-08-14-76 | 08/14/2024 | 08/23/2024 | Acceptance | Asphaltic Emulsion | View |
| 2024-08-12-74 | 08/12/2024 | 08/23/2024 | Acceptance | Asphaltic Emulsion | View |
| 2024-08-13-110 | 08/13/2024 | 08/23/2024 | Acceptance | Asphaltic Emulsion | View |
| 2024-08-07-77 | 08/07/2024 | 08/12/2024 | Acceptance | Asphaltic Emulsion | View |
| 2024-08-08-54 | 08/08/2024 | 08/12/2024 | Acceptance | Asphaltic Emulsion | View |
| 2024-08-08-53 | 08/08/2024 | 08/12/2024 | Acceptance | Asphaltic Emulsion | View |
| 2024-08-06-73 | 08/06/2024 | 08/06/2024 | Quality Assurance | Aggregate | View |
| 2024-08-05-48 | 08/05/2024 | 08/05/2024 | Quality Assurance | Aggregate | View |
| 2024-08-05-39 | 08/05/2024 | 08/07/2024 | Acceptance | Asphaltic Emulsion | View |
| 2024-07-30-43 | 07/30/2024 | 08/02/2024 | Acceptance | Asphaltic Emulsion | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
