Project Details
This page displays current information for project DEA: 120S1904.
Project Information
| Project Identifiers | Project ID: 1000213 DEA: 120S1904 EFIS: 1219000104 |
|---|---|
| DIST-CO-RTE-PM | 12-ORA-22-R11.6/R12.5 |
| Award Date | 06/06/2024 |
| Closeout Date | Not set |
| Work Description | AUXILIARY LANE EXTENSION. |
| Location Description | ORANGE COUNTY IN SANTA ANA AND ORANGE FROM 0.1 MILE WEST OF SANTIAGO CREEK TO 0.2 MILE EAST OF CAMBRIDGE STREET OVERCROSSING |
| QA Service Level | 1 (Verified on 05/28/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| jharvey@fountainheadcorp.com | Jessica Harvey | Resident Engineer | Caltrans RE DB |
| bijan.ronagh-langroodi@dot.ca.gov | Bijan Ronagh-langroodi | Structural Representative | Caltrans SR DB |
| scott.bauer@dot.ca.gov | Scott Bauer | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 14 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-07-11-25 | 07/11/2025 | 07/11/2025 | Quality Assurance | Hot Mix Asphalt | View |
| 2025-01-18-2 | 01/18/2025 | 01/19/2025 | Quality Control | Concrete | View |
| 2025-01-03-37 | 01/03/2025 | 01/04/2025 | Quality Control | Concrete | View |
| 2025-01-03-36 | 01/03/2025 | 01/04/2025 | Quality Control | Concrete | View |
| 2025-01-17-42 | 01/17/2025 | 01/18/2025 | Quality Control | Aggregate | View |
| 2024-12-24-6 | 12/24/2024 | 12/25/2024 | Quality Control | Concrete | View |
| 2025-04-25-28 | 04/25/2025 | 04/28/2025 | Quality Assurance | Concrete | View |
| 2025-04-01-13 | 04/01/2025 | 04/02/2025 | Quality Assurance | Concrete | View |
| 2025-01-09-66 | 01/09/2025 | 01/09/2025 | Quality Control | Aggregate | View |
| 2025-01-17-37 | 01/17/2025 | 01/19/2025 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
