Project Details
This page displays current information for project DEA: 032G5404.
Project Information
| Project Identifiers | Project ID: 1000091 DEA: 032G5404 EFIS: 0321000237 |
|---|---|
| DIST-CO-RTE-PM | 03-YOL-128,505-VAR |
| Award Date | 05/30/2024 |
| Closeout Date | 04/09/2025 |
| Work Description | PLACE AND FURNISH POLYESTER CONCRETE OVERLAY, & REPLACE JOINT SEALS. |
| Location Description | YOLO COUNTY AT VARIOUS LOCATIONS |
| QA Service Level | 1 (Verified on 02/26/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| nimi.badwalz@dot.ca.gov | Nimi Badwalz | Resident Engineer | Caltrans RE DB |
| brent.bullard@dot.ca.gov | Brent Bullard | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-9 of 9 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2024-10-14-5 | 10/14/2024 | 10/14/2024 | Acceptance | Roadway/Bridge Surface | View |
| 2024-10-04-63 | 10/04/2024 | 10/10/2024 | Quality Assurance | Concrete | View |
| 2024-09-18-33 | 09/18/2024 | 09/18/2024 | Quality Assurance | Concrete | View |
| 2024-09-17-49 | 09/17/2024 | 09/17/2024 | Quality Assurance | Roadway/Bridge Surface | View |
| 2024-09-17-48 | 09/17/2024 | 09/17/2024 | Quality Assurance | Roadway/Bridge Surface | View |
| 2024-09-16-48 | 09/16/2024 | 09/16/2024 | Quality Assurance | Roadway/Bridge Surface | View |
| 2024-09-16-47 | 09/16/2024 | 09/16/2024 | Quality Assurance | Roadway/Bridge Surface | View |
| 2024-08-28-27 | 08/28/2024 | 08/28/2024 | Quality Assurance | Concrete | View |
| 2024-08-28-24 | 08/28/2024 | 08/28/2024 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
