Project Details
This page displays current information for project DEA: 061F2004.
Project Information
| Project Identifiers | Project ID: 1000080 DEA: 061F2004 EFIS: 0622000190 |
|---|---|
| DIST-CO-RTE-PM | 06-TUL-190-R32.8,R40.0 |
| Award Date | 04/05/2024 |
| Closeout Date | 01/23/2025 |
| Work Description | PLACE POLYESTER CONCRETE OVERLAY, EPOXY INJECTION, AND JOINT SEAL. |
| Location Description | TULARE COUNTY NEAR SPRINGVILLE AT NORTH FORK TULE RIVER BRIDGE AND AT NORTH FORK MIDDLE FORK TULE RIVER BRIDGE |
| QA Service Level | 1 (Verified on 01/29/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| cesar.mandujano@dot.ca.gov | Cesar Mandujano | Resident Engineer | Caltrans RE DB |
| albert.x.heredia@dot.ca.gov | Albert Heredia | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-2 of 2 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2024-10-08-3 | 10/08/2024 | 10/08/2024 | Acceptance | Roadway/Bridge Surface | View |
| 2024-09-23-56 | 09/23/2024 | 09/24/2024 | Quality Control | Polyester | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
