Project Details
This page displays current information for project DEA: 072XK404.
Project Information
| Project Identifiers | Project ID: 1000070 DEA: 072XK404 EFIS: 0724000094 |
|---|---|
| DIST-CO-RTE-PM | 07--- |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | Not set |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 01/22/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| Sam.Toutounchian@dot.ca.gov | Sam Toutounchian | Resident Engineer | Caltrans RE DB |
| peter.c.wang@bureauveritas.com | Peter Wang | Structural Representative | Caltrans SR DB |
| maziar.kazemian@dot.ca.gov | Maziar Kazemian | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-5 of 5 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-02-28-4 | 02/28/2025 | 03/05/2025 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2025-02-28-3 | 02/28/2025 | 03/05/2025 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2025-01-27-3 | 01/27/2025 | 01/29/2025 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2025-01-27-2 | 01/27/2025 | 01/29/2025 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2025-01-27-1 | 01/27/2025 | 01/29/2025 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
