Project Details
This page displays current information for project DEA: 120U2304.
Project Information
| Project Identifiers | Project ID: 1000036 DEA: 120U2304 EFIS: 1223000056 |
|---|---|
| DIST-CO-RTE-PM | 12-ORA-241-14.6/33.7 |
| Award Date | 03/06/2024 |
| Closeout Date | 11/07/2024 |
| Work Description | COLD PLANE AC PAVEMENT, PLACE RHMA AND HMA. |
| Location Description | ORANGE COUNTY AT VARIOUS LOCATIONS FROM OSO PARKWAY OVERCROSSING TO SANTIAGO CREEK |
| QA Service Level | 1 (Verified on 01/26/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| luis.a.vazquez@dot.ca.gov | Luis Vazquez | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-5 of 5 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2024-06-19-107 | 06/19/2024 | 06/26/2024 | Quality Assurance | Hot Mix Asphalt | View |
| 2024-06-18-107 | 06/18/2024 | 06/26/2024 | Quality Assurance | Hot Mix Asphalt | View |
| 2024-06-17-101 | 06/17/2024 | 06/21/2024 | Quality Assurance | Hot Mix Asphalt | View |
| 2024-05-21-57 | 05/21/2024 | 05/22/2024 | Verification | Asphalt Binder | View |
| 2024-05-21-36 | 05/21/2024 | 05/22/2024 | Verification | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
