Project Details
This page displays current information for project DEA: 033H8304.
Project Information
| Project Identifiers | Project ID: 1000015 DEA: 033H8304 EFIS: 0318000075 |
|---|---|
| DIST-CO-RTE-PM | 03-PLA-49-3.5/7.5 |
| Award Date | 01/06/2025 |
| Closeout Date | Not set |
| Work Description | CONSTRUCT SIDEWALKS, CURB RAMPS AND DRAINAGE FACILITIES. CONSTRUCT PEDESTRIAN BRIDGE |
| Location Description | PLACER COUNTY IN AND NEAR AUBURN FROM 0.3 MILE NORTH OF ROUTE 80/49 SEPARATION TO 0.1 MILE NORTH OF DRY CREEK ROAD |
| QA Service Level | 1 (Verified on 01/18/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| Lucas.Price@dot.ca.gov | Lucas Price | Resident Engineer | Caltrans RE DB |
| eric.duray@dot.ca.gov | Eric Duray | Structural Representative | Caltrans SR DB |
| farzan.kazemi@dot.ca.gov | Farzan Kazemi | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 12 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-10-07-87 | 10/07/2025 | 10/08/2025 | Quality Assurance | Concrete | View |
| 2025-09-19-70 | 09/19/2025 | 09/20/2025 | Quality Assurance | Concrete | View |
| 2025-09-10-104 | 09/10/2025 | 09/11/2025 | Quality Assurance | Concrete | View |
| 2025-09-04-87 | 09/04/2025 | 09/05/2025 | Quality Assurance | Concrete | View |
| 2025-08-26-102 | 08/26/2025 | 08/27/2025 | Quality Assurance | Concrete | View |
| 2025-08-25-116 | 08/25/2025 | 08/26/2025 | Quality Assurance | Concrete | View |
| 2025-06-26-113 | 06/26/2025 | 06/26/2025 | Quality Control | Aggregate | View |
| 2025-07-25-30 | 07/25/2025 | 07/25/2025 | Quality Assurance | Concrete | View |
| 2025-07-18-50 | 07/18/2025 | 07/18/2025 | Quality Assurance | Concrete | View |
| 2025-06-30-23 | 06/30/2025 | 06/30/2025 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
