Project Details
This page displays current information for project DEA: 080C2514.
Project Information
| Project Identifiers | Project ID: 212112 DEA: 080C2514 EFIS: 0816000076 COOP: 081645 |
|---|---|
| DIST-CO-RTE-PM | 08-SBD-10-0.0/13.2 |
| Award Date | 06/06/2018 |
| Closeout Date | Not set |
| Work Description | Design-Build of I-10 Corridor Contract 1 - Adding 2 new Express Lanes |
| Location Description | LA/SBD County Line to PM 13.2 near I-15 |
| QA Service Level | 1 (Verified on 10/16/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| jcorona@syrusaengineering.com | Jose Corona | Resident Engineer | Caltrans RE DB |
| lnegrete@syrusaengineering.com | Luis Negrete | Structural Representative | Caltrans SR DB |
| james.devey@dot.ca.gov | James Devey | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 951-960 of 1072 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2021-05-06-7 | 05/06/2021 | 05/07/2021 | Quality Assurance | Concrete | View |
| 2021-04-28-12 | 04/28/2021 | 05/03/2021 | Quality Assurance | Concrete | View |
| 2021-04-28-5 | 04/28/2021 | 04/30/2021 | Quality Assurance | SMTL TM6 - Ductile Iron Cast Samples | View |
| 2021-04-13-24 | 04/13/2021 | 05/14/2021 | Per Request | SMTL TM5 - Couplers | View |
| 2021-04-13-23 | 04/13/2021 | 05/24/2021 | Per Request | SMTL TM5 - Couplers | View |
| 2021-04-20-18 | 04/20/2021 | 04/26/2021 | Quality Assurance | Concrete | View |
| 2021-04-21-12 | 04/21/2021 | 04/22/2021 | Quality Assurance | Concrete | View |
| 2021-04-20-13 | 04/20/2021 | 04/21/2021 | Quality Assurance | Concrete | View |
| 2021-04-17-3 | 04/17/2021 | 04/18/2021 | Quality Control | Concrete | View |
| 2021-04-15-9 | 04/15/2021 | 04/16/2021 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
