Project Details
This page displays current information for project DEA: 081C38U4.
Project Information
| Project Identifiers | Project ID: 213707 DEA: 081C38U4 EFIS: 0817000196 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-10-6.7/R25.1 |
| Award Date | 11/26/2019 |
| Closeout Date | 11/01/2023 |
| Work Description | Remove concrete pavement and base, and place HMA and JPCP |
| Location Description | ROUTE 10/60 SEPARATION IN BEAUMONT TO ROUTE 10/111 SEPARATION NEAR CABAZON. |
| QA Service Level | 1 (Verified on 01/09/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| elvira.lenart@dot.ca.gov | Elvira Lenart | Resident Engineer | Caltrans RE DB |
| james.devey@dot.ca.gov | James Devey | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 921-930 of 1400 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2021-03-15-7 | 03/15/2021 | 03/16/2021 | Quality Assurance | Concrete | View |
| 2021-03-19-5 | 03/19/2021 | 03/22/2021 | Quality Assurance | Concrete | View |
| 2021-03-19-4 | 03/19/2021 | 03/22/2021 | Quality Assurance | Concrete | View |
| 2021-03-18-6 | 03/18/2021 | 03/22/2021 | Quality Assurance | Concrete | View |
| 2021-03-17-13 | 03/17/2021 | 03/19/2021 | Quality Assurance | Concrete | View |
| 2021-03-14-1 | 03/14/2021 | 03/16/2021 | Quality Assurance | Concrete | View |
| 2021-03-16-4 | 03/16/2021 | 03/17/2021 | Quality Assurance | Concrete | View |
| 2021-03-07-1 | 03/07/2021 | 03/08/2021 | Quality Assurance | Concrete | View |
| 2021-03-04-10 | 03/04/2021 | 03/05/2021 | Quality Assurance | Concrete | View |
| 2021-03-03-11 | 03/03/2021 | 03/04/2021 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
